News & Newsletters
Read moreClient: GTC
List of Completed Projects:
| Project/Contact | Tasks | Project Management |
Cliftondale John Lawrence |
New 230/25 kV Substation and protection. |
Relay and Control Design which included panel fabrication, drawing and material list. |
Southeast Paper Daniel Lascau |
Replaced two 115 kV breakers, replaced line and bus protection panels. Installed Digital Fault Recorder, Sequence Event Recorder panels and modified the existing panels to provide input. |
Relay and Control Design which included panel fabrication, drawing and material list. |
Riceboro Daniel Lascau |
Replaced two line 115 kV breakers, replaced line and bus protection panels. Replace capacitor bank circuit switcher with breaker and it's panel. Installed Digital Fault Recorder, Sequence Event Recorder panels and modified the existing panes to provide input. |
Relay and Control Design which included panel fabrication, drawing and material list. |
South Acworth Daniel Lascau |
Installed a second 115 kV bus, connected the bus to 115/25 kV transformer and modified 115 kV bus differential |
Physical Engineering which included station. |
Lassiter Road Daniel Lascau |
Replaced an existing 115/25 kV LTC with a 50 MVA bank. Replaced two AOM switches with Circuit Switchers. Also installed two new transformer protection panels, 115 kV bus differential and 25 kV bus differential panels. We also modified the auto bank and its feed. |
Physical engineering, material call out and construction management. Relay and Control design which included panel fabrication, drawing and material list, retrofit existing breakers with SEL 351, and engineered new protection scheme with existing equipment. |
Sharron Springs Daniel Lascau |
New 230/25 kV substation in Green Field. |
Physical engineering, material call out and construction management. Relay and Control design which included panel fabrication, drawing and material list. |